By Ross McLane & Qiyu Liu
The United States will need much more public direct current fast-charging (DCFC) to keep up with the coming wave of electric vehicles (EVs). These public DCFCs are vital for EV drivers’ peace-of-mind, enable long-distance trips, and empower consumers without access to home-charging to buy an EV. The problem is that they simply aren’t being built fast enough and in large enough volumes to keep up with transportation sector decarbonization targets in line with limiting global temperature rise to 1.5°C.
While the exact amount of DCFC the United States needs is still up for debate, there is no question that it will be much more than the 17,000 fast-charging plugs currently installed. Over half of these are owned by Tesla and a third of them are in California. This state alone is projected to need as many as 25,000 public fast-chargers by 2025 to meet its goal of 5 million EVs on the road by 2030.
The speed with which the United States can put that metal in the ground, however, is limited by the current economics of fast charging. Because all but the most highly used stations lose money, charging providers can only build in the relatively few locations that are likely to have sufficient business. That means DCFC growth is incremental, when it needs to be exponential. Unless either the costs of procuring, installing, and operating DCFCs are reduced or demand for EV charging rises significantly, this limited build-out will remain the status quo.
The economic difficulties of fast-charging stations not only threaten to limit the rate of EV adoption in the United States but can also have consequences for whether or not charging systems provide reasonable rates for consumers, including less affluent drivers. If charging provider margins do not improve, it is unlikely that the price that EV owners pay for fast charging (typically 2–3 times more than it costs to charge at home) will be reduced.
As the EV transition gains steam and auto-manufacturers phase out gas-powered models, EVs will move past affluent early-adopters and into the hands of drivers from all socio-economic backgrounds. Lower-income drivers are less likely to have access to home charging and therefore will be forced to rely much more heavily on public charging and pay its price premium. The result is an inequitable situation where lower income EV owners could pay many times more for fuel that wealthier EV drivers.
Increasing the speed of public fast charging build-out and ensuring equitable outcomes will require a wide-array of actions by both industry stakeholders and all levels of government. To get a flavor for what this could look like, we can look to China, where EV charging has been a matter of national policy since 2014. Over the past decade, China has rapidly grown its public fast-charging network to over 309,000 public fast-charging plugs (about one for every twelve EVs in the country).
Due to its size, China’s charging market has realized significant economies-of-scale, dramatically lowering the cost of purchasing and installing public fast-charging stations. China has also managed to do all of this while keeping fast-charging prices between 1–1.8 yuan/kWh (US$0.15–0.28/kWh, only about 1-2 times the price that an EV owner would pay to charge at home), making EV charging relatively affordable for all citizens regardless of their housing situation.
Understanding how China has achieved this scale and affordability in fast-charging in such a short time can provide a glimpse as to how something similar can be done in the United States.
China’s Road to Fast Charging
The first thing to understand about China’s EV charging journey is just how vital public charging is to its transportation electrification goals. In the large metropolises in China, where over half of the population lives, land is scarce, and most people live in multi-unit dwellings (usually high-rises). Single-family detached housing in those cities is rare. Consequently, very few people are able install Level 2 charging plugs in their garages. Most EV adopters, instead, rely exclusively on public charging—often DCFC due to its convenience.
Early on, the Chinese central government recognized the necessity of public charging, especially fast charging, to achieve its electrification goals and began developing a framework of policies and targets to promote the rapid scale up of such a network. This framework was and continues to be implemented on the provincial and municipal levels and can be grouped into seven strategies:
- Making charging a national priority: In 2015, the central government set a goal to build 12,000 centralized charging stations with 4.8 million EV charging plugs by 2020. The most recent endorsement from the central government was the “New Infrastructure Plan” announced in early 2020, listing charging infrastructure as one of the top six priorities for the country’s future economic development. These national priorities inform similar targets, goals, and mandates at the provincial and municipal levels.
- Stimulating public charging demand: In promoting the transition to electric vehicles, China prioritized electrification of vehicle segments that heavily use public infrastructure, like taxis, ride-hailing vehicles and logistics fleets. Doing so generated charging demand and improved the business prospects of public charging providers.
- Reforming utility tariffs: In 2014, the central government issued “The Notice of Electric Vehicle Charging Prices” which permitted all public charging stations to be on “industrial electricity rates,” lower than the commercial electricity rates they would normally pay. Importantly, they were also given exemption from any demand charges on those tariffs (fees based on maximum charging power which can dominate utility bills at less frequented charging stations)—an exemption that will continue until 2025.
- Capping charging provider service fees: In the same notice, the government allowed cities to set caps on the service fees that charging providers could charge. Service fees are the rates that charging providers charge on top of their cost of electricity in order to recoup upfront investment and provide profit. The caps on these service fees vary from location to location but are typically set around 0.6–1.0 yuan/kWh ($0.09–0.15/kWh). By keeping charging prices low, the total cost of owning an EV was made more affordable, incentivizing more people to buy them.
- Charger Subsidization: Subsidies for charging stations are implemented on the provincial and municipal levels and can be as high as 30 percent of installation costs. Some subsidies are based a percentage of initial investment, while others accumulate based on the total power of the charging installation. In recent years, performance-based incentives, which calculate subsidy based on total energy output, have emerged in order to promote and reward highly utilized charging stations.
- Utility involvement and cost-sharing: While most charging stations in China are privately-owned, they are not exclusively so. State Grid Corporation, one of the two utility companies in China, owns 88,000 charging plugs, the second-most in the country. Additionally, both State Grid and China Southern Grid use social responsibility budgets to cover the costs of distribution-level grid upgrades needed for public charging stations. The charging providers, however, are still responsible for covering the costs of step-down transformers, meters, panels, and any trenching or boring required for grid interconnection.
- Charging station aggregation: In China there is a policy emphasis on “concentrated” charging, referring to stations densely populated with plugs. This emphasis, partly driven by land scarcity and partly intended to drive lower station costs, has enabled large growth in public charging infrastructure in crowded cities. Building concentrated charging stations allows the costs of utility interconnection, grid upgrades, and land to be spread over more revenue generating assets. It also simplifies the process of utility interconnection, because a concentrated station only needs one round of approval. As an example, in 2019, a charging station was installed in City of Shenzhen with 637 fast-chargers, more than any other station in the world.
As a result of this aggressive strategy, the scale and speed of charging construction in China exploded. In 2019, public charging stations grew at a rate of 17,000 plugs per month. In 2020, the number of public plugs crested at 807,000, 309,000 of which were fast-charging plugs. On average prices for public fast-charging were between RMB 1–1.8/kWh, only 1–2 times more expensive than home charging, making electric fueling relatively affordable for all citizens regardless of their housing situation.
The scale in China’s charging market has yielded reductions in the costs of manufacturing and constructing public charging stations, especially fast-charging stations. The Electric Vehicle Charging Infrastructure Promotion Alliance (EVCIPA) released data showing that from 2016 to 2019, the cost of public fast-charging equipment dropped 67 percent to about $3,000 for a 50 kW DCFC unit. This is compared to $20,000 to $35,000 for a comparable DCFC unit in the United States.
In 2019, a joint study between the Natural Resources Defense Council (NRDC) and EV100 analyzed the finances of a typical charging station in China with 30 60-kW plugs and found that the entire installation cost $312,000 before subsidies. For comparison, in the United States, the equipment for 30 50-kW charging plugs would cost between $600,000 and $1.1 million alone. These cost reductions have been contributing factors to the acceleration of public charging infrastructure construction in China.
The United States’ Own Road to Fast Charging
To achieve its own ubiquitous and affordable public fast charging network, the United States will have to go its own road based on its unique set of social, political, and economic conditions. Like China, the United States will need strong public charging goals on the national, state, and local levels and will need to capitalize programs to support those goals.
Government will need promote vehicle electrification, especially of the segments that heavily use public charging. Utility rates will need to be re-designed to promote rather than stifle early stages of vehicle electrification and utilities will need to take an active role in sharing the burden of the transition to a clean transportation system. Finally, the United States will need to ensure that the charging system that it builds works for all its users, regardless of their background or housing situation.
In some respects, the United States’ road to a fast-charging network will be more complex than in China—it will take navigating a complex system of investor-owned utilities, public utility commissions, municipal utilities and rural electric co-ops. This road, however, also has unique opportunities. For instance, because the United States has a wholesale electricity market, US charging providers have an economic opportunity in the form of providing demand response to the power grid. Doing so provides an additional source of revenue which has the potential to make public charging business models more sustainable.
One thing that is the same, regardless of the country, is that rapidly scaling up public charging—especially public fast charging infrastructure—will take collaboration and compromise. And it needs to happen immediately in order to keep the planet on track for a sustainable future.
Courtesy of Rocky Mountain Institute
Featured Image Electrify America Charging Infrastructure, courtesy of Cynthia Shahan, EVObsession
purchase lasuna sale – diarex cost buy himcolin for sale
gabapentin 800mg cost – buy azulfidine 500mg order azulfidine generic
besivance online – buy generic carbocisteine sildamax tablets
brand benemid – buy probenecid 500mg online cheap where to buy carbamazepine without a prescription
buy mebeverine cheap – buy arcoxia pills for sale order cilostazol sale
voltaren 100mg drug – generic diclofenac 100mg aspirin pill
generic rumalaya – where can i buy shallaki purchase endep online
where to buy mestinon without a prescription – buy sumatriptan generic buy imuran
brand baclofen – feldene 20 mg generic piroxicam cheap
voveran where to buy – order isosorbide 20mg pills nimodipine over the counter
purchase mobic online cheap – oral mobic buy ketorolac for sale
buy omnicef generic – clindamycin cost
order trihexyphenidyl generic – trihexyphenidyl cost buy emulgel online
buy generic accutane for sale – buy dapsone cheap order deltasone 40mg pill
order deltasone 40mg generic – buy omnacortil cheap buy elimite medication
buy permethrin – tretinoin us tretinoin gel cheap
where to buy betamethasone without a prescription – buy generic differin over the counter benoquin ca
metronidazole uk – cenforce 100mg pills buy cenforce 50mg for sale
generic amoxiclav – buy synthroid 100mcg online levothyroxine order online
buy cozaar 50mg generic – buy cephalexin 250mg for sale buy cephalexin medication
purchase cleocin pill – order cleocin generic buy indomethacin 75mg online cheap
buy eurax cream – buy aczone sale aczone brand
buy modafinil 100mg generic – cost modafinil 100mg meloset 3mg usa
bupropion buy online – order xenical 60mg online buy cheap shuddha guggulu
order capecitabine 500 mg – purchase danocrine for sale cost danazol 100 mg
progesterone us – ponstel where to buy where to buy fertomid without a prescription
estrace 2mg without prescription – ginette 35 pills buy arimidex paypal
dostinex ca – order cabgolin sale alesse tablets
гѓ—гѓ¬гѓ‰гѓ‹гѓі её‚иІ© гЃЉгЃ™гЃ™г‚Ѓ – г‚ўгѓўг‚г‚·гѓ«йЂљиІ©гЃЉгЃ™гЃ™г‚Ѓ г‚ўг‚ёг‚№гѓгѓћг‚¤г‚·гѓі еЂ‹дєєијёе…Ґ гЃЉгЃ™гЃ™г‚Ѓ
バイアグラ йЈІгЃїж–№ – г‚·гѓ«гѓ‡гѓЉгѓ•г‚Јгѓ«гЃ®йЈІгЃїж–№гЃЁеЉ№жћњ г‚·г‚ўгѓЄг‚№йЂљиІ©